Arena Zagreb
About Arena Zagreb
Laniste
Zagreb, Croatia
10000
ADD TO LIST
WRITE REVIEW
Arena Basketball Building Concert Hall Gym Handball Polo Stadium Volleyball Water Polo The Croatian Government and the City Government of Zagreb held a public tender for the construction of a sports hall in order to host games in the 2009 World Men's Handball Championship, and later for numerous other sporting, cultural and business events. They selected the consortium composed of property developers TriGránit (from Hungary) and Ingra (construction company)(from Croatia). The TriGránit/Ingra offer was initially approved on April 25, 2007, but the signing of the final contract was delayed because of Mayor Milan Bandić expressing discontent with the conditions. The Consortium engaged studio UPI-2M from Zagreb, specially for this project to create and produce a unique design for Arena Zagreb. The construction of the sports hall finally started on July 20, 2007, and was completed as planned, on December 15, 2008. The Arena will then be used for futsal, handball, athletics, basketball, volleyball, numerous other sporting competitions and various concerts, exhibitions, fairs, conventions and congresses. The shopping center and Arena Zagreb will share a series of services such as a joint parking lot, multiplex cinema, wellness center, numerous restaurants, cafes and stores. Resembling a giant rib cage around the building, 86 large pre-stressed, pre-fabricated concrete curved columns form the main façade, connected by a semi-translucent polycarbonate envelope that allows for various light effects. It’s one of the landmarks of Zagreb already, along with the cathedral. Developing spatial and functional characteristics to enable maximum flexibility of the venue was vital during the schematic design stage. The telescopic system of 4,500 seats was a critical element in allowing different configurations and quick turnaround between events. The singular vision also led to provision of spacious facilities for athletes, other performers and event managers, a concept for simple and fluid visitor circulation, a mix of catering facilities and designing in smaller, mutually independent zones that could all be used at the same time. Getting the acoustics right was important too. The steel roof structure had sufficient bearing capacity to enable the suspension of additional stage equipment. The roof structure is close to the structure of a suspension bridge, which is an uncommon approach (in arena design) anywhere in the world. The roof ’s bearing structure is only 45 cm high, over a span of 110 m, because it is suspended from the upper side of the roof outside and can’t be seen from the interior. This solution was made feasible by contemporary cable production technology – the span is suspended on cables that have a diameter of just 66 mm. Each cable can carry 400 tons. Arena Zagreb won the Structural Design of the Year award at the 2009 World Architecture Festival. Payment Accepted:
Getting there:
On the south entrance to Zagreb city.
[Flag as duplicate]
Mar 10, 2010 Wow! Great place, beautiful design and spectacular architecture! For now there was a lot of star singers from Croatia and world, and they are still coming ;) Music: Prljavo Kazalište, Zdravko Čolić, Mišo Kovač, Beyoncé, London Symphony Orchestra, Tony Cetinski, Lepa Brena, Halid Bešlić, Eros Ramazzoti, Miroslav Škoro, Backstreet Boys, Parni valjak, José Careras, Depeche Mode, Miroslav Ilić, Plavi orkestar, Leonard Cohen, Rammstein, Haris Džinović, Tokio Hotel, Željko Samardžić, David Guetta, Oliver Dragojević, Guns 'N' Roses, Abba Show, Lady Gaga...
Hotels Near Arena Zagreb
CHECK RATES From 243 HRK CHECK RATES From 413 HRK CHECK RATES From 320 HRK CHECK RATES From 638 HRK CHECK RATES From 371 HRK CHECK RATES From 282 HRK CHECK RATES From 438 HRK CHECK RATES From 319 HRK CHECK RATES From 486 HRK CHECK RATES From 276 HRK Related Links
Travel insurance from Worldnomads.com
|