The High Dam

About The High Dam
5 star:
(1)
4 star:
(0)
3 star:
(1)
2 star:
(0)
1 star:
(0)
Aswan, Egypt
ADD TO LIST
WRITE REVIEW
Know something about The High Dam? Add a description to help fellow travelers!
Payment Accepted:
Last edited on Dec 7, 08 1:51 AM.
Contributors: May K. Show History
[Flag as duplicate]
2 Reviews of The High Dam  
WRITE REVIEW
First To Review: May K.
542
27
644
5.0 star rating
Dec 7, 2008
Its construction started with Nasser in1960 and ended with Saddat in 1972.
It saves Egypt from drought, it's also a hydro-electric power station. However its construction was a threat to some temples as Abou Sinle and Philae. It took 7 years to displace Philae(300m) and save it. Besides, 6000 persons were displaced in order to build it.
|
Was this helpful?
(0)
3.0 star rating
Aug 24, 2009
IMpressive construction createing a huge lake. INteresting to be seen.
|
Was this helpful?
(0)
Hotels Near The High Dam
1.2 star rating
CHECK RATES
From 344 EGP
4.0 star rating
CHECK RATES
From 206 EGP
0.0 star rating
CHECK RATES
From 369 EGP
0.0 star rating
CHECK RATES
From 344 EGP
0.0 star rating
CHECK RATES
From 1163 EGP
0.0 star rating
CHECK RATES